Location
Tampa International Airport
Project
Project consisted of a 89,000 sq ft 12.5” thick concrete hanger, 159,000 sq ft 16” thick concrete apron, and an additional 15,000 sq ft of 7” thick concrete paving.
Licensed. Bonded. Insured
Lic C-10017
PAGES
Share On: